<aside>

Purpose:

This page explains what an IMPALA implementation costs: how we count costs, what a standard ward package includes and what it costs, which costs are one-off and which recur, why costs vary between projects, and how these figures relate to the Rethink Priorities Report cost-effectiveness assessment.

How to use this page:

This page was last updated: November 9, 2026

</aside>

<aside>

1. Understanding intervention costs within our operating model

</aside>

In traditional cost-effectiveness calculations for NGO programmes, programme costs include the organisation’s overhead. Funders pay for the whole operation, so the whole operation is counted.

GOAL 3 works differently. We sell a product at a price designed to sustain the organisation at scale and, over time, repay the development of the product. That commercial price is therefore the cost we use in our cost-effectiveness calculations. The initial development was financed by impact investment, in-kind contributions and subsidies (see section 2.1 of Hybrid model explained ). The sales price is set at a level at which we believe IMPALA can be sold and sustained at sufficient scale for GOAL 3 to become profitable. The risk of development and of reaching break-even is therefore carried by investors rather than philanthropic capital, on the assumption that investors are repaid through returns once GOAL 3 is profitable.

<aside>

2. An IMPALA implementation

</aside>

An IMPALA implementation should not be understood as a one-off purchase of medical devices. It combines the physical system with the service model needed to make the system useful, maintained, and embedded in daily clinical care. This distinction matters because many medical equipment donations fail when equipment is delivered without the surrounding implementation model (Perry & Malkin, 2011): staff are not trained, devices are not maintained, and spare parts are unavailable. GOAL 3 therefore prices implementation as a complete package rather than as isolated hardware.

A standard ward implementation has three core elements:

  1. Bedside IMPALA monitors;
  2. The IMPALA Platform: software, a local server, local Wi-Fi network, central patient overview, tablets, and dashboards;
  3. Implementation and long-term support. This starts with an installation week and a three-month implementation period with training, onboarding, workflow adaptation and remote check-ins. After that, IMPALA Care provides quarterly check-ins and remote troubleshooting.

<aside>

3. Costs of a standard implementation

</aside>

The standard package for one ward is 10 IMPALA monitors and one local server. The one-off investment is US$24,850. This includes:

After the implementation period, an annual platform and support fee of US$2,000 for a standard 10-monitor ward covers ongoing support:

In short, over five years, the standard package costs US$31,850, excluding taxes, duties, travel, and transport (with a $3,000 discount if annual service fee is paid for in advance for 5 years). These vary by country and procurement route and are quoted separately per project. This example is useful because it shows the basic implementation logic; actual project budgets may differ.

3.1. One-off costs versus recurring costs

<aside>

4. Why costs may differ by country or project

</aside>

The standard package is a reliable baseline, but final costs vary with context: import duties, taxes, transport and travel; hospital size and the number, type, and location of wards; the number of monitors required; local availability of biomedical technicians and the maturity of implementation partners; data and reporting requirements; and whether the implementation is a one-site project or part of a larger scale-up in which hospitals, government, NGOs, or funders share costs. A small single-ward implementation carries relatively higher costs because travel, installation, and training are spread across fewer monitors and patients; a larger country programme reduces average costs by spreading training, logistics, support, and project management over more hospitals.

<aside>

5. Which costs may decrease with scale?

</aside>

Several cost categories are expected to become more efficient as GOAL 3 scales:

Not all costs should be expected to disappear, however: software support, maintenance, troubleshooting, refresher training, data review, and replacement accessories remain essential to long-term quality and sustainability.

<aside>

6. How these figures relate to the Rethink Priorities assessment

</aside>

Rethink Priorities' independent cost-effectiveness assessment (October 2026) uses the same price list, but a different configuration of it: monitors with a 2-year warranty and an all-inclusive service fee, coming to US$21,850 one-off plus US$2,811 per year, annualised over a 7-year lifetime to approximately US$6,100 per ward per year. This is the same configuration used in the published cost-effectiveness study (Ben et al., 2026); RP describes its cost assumptions as deliberately conservative: it takes the maximum expected cost of each line item and assumes no scale effects.

The difference with the current commercial model is packaging, not price level: the extended warranty moved into the hardware price and the recurring fee became a leaner platform and support fee with optional add-ons. Over five years the two configurations differ by roughly 3% (US$34,850 versus US$35,905, excluding taxes and transport). RP also models taxes at a central 5% of equipment cost (10% in its low case), reflecting that most implementations are exempt, whereas actual tax costs are quoted per project and are higher where exemptions do not apply. For an in-depth explanation, please see Rethink Priorities Report

For the clinical and cost-effectiveness evidence this configuration is grounded in, including the cost-per-life-saved and cost-per-DALY-averted estimates from Ben et al. (2026), see Evidence Summary Dashboard — C13: cost-effectiveness and C11: mortality and DALY impact on Notion.